Spalling Repairs
By preventing the intrusion of moisture, chemicals, salt water, sewage and other harmful materials, Xypex protects concrete and reinforcing steel from deterioration and oxidation.
The concrete is also protected against spalling, efflorescence, popouts and other damage caused by weathering, bleeding of the salts and internal expansion and contraction during the freeze/thaw cycle.
A step-by-step guide to spalling repairs with Xypex products can be downloaded from the PDF.
Download Method Statements
