Xypex has a range of method statements and schematics for new structures that will assist in your specification, application and installation.
Schematic No. 1
Construction Joint Cold Joint Details - Traffic Bearing Slabs
Schematic No. 2
Construction Joint Cold Joint Details - Liquid Retaining Structures and Infrequent Hydrostatic Pressures
Schematic No. 3
Construction Joint Cold Joint Details - Wall onto Slab Detail
Schematic No. 4
Construction Joint Cold Joint Details - Slab into Wall Detail (External Water Pressure)
Schematic No. 5
Construction Joint Cold Joint Details - Slab into Wall Detail (Internal Water Pressure)
Schematic No. 6
Construction Joint Cold Joint Details - Standard Pipe Penetration
Schematic No. 7
Construction Joint Cold Joint Details - Below Grade - Slab into Wall
Schematic No. 8
Construction Joint Cold Joint Details - Below Grade - Wall Onto Slab
Schematic No. 9
Construction Joint Cold Joint Details - Multi-Level Below Grade - Slab into Wall
Schematic No. 10
Construction Joint - Non Aggressive SoilWater Constant External Hydrostatic Pressure
Schematic No. 11
Construction Joint - Aggressive SoilWater Constant External Hydrostatic Pressure
Schematic No. 12
Construction Joint Cold Joint Details - Retaining Wall
Schematic No. 13
Construction Joint Cold Joint Details - Parking Deck - Infrequent Hydrostatic Pressure
Schematic No. 14
Construction Joint Cold Joint Details - Roof Deck with Soil - Constant Hydrostatic Pressure
Schematic No. 15
Construction Joint Cold Joint Details - Hydraulic Elevator Pit
Schematic No. 16
Construction Joint Cold Joint Details - Elevator Pit, Sump Pit
Schematic No. 17
Construction Joint Cold Joint Details - Planter
Schematic No. 18
Construction Joint Cold Joint Details - Tunnel or Service Tunnel
Schematic No. 19
Construction Joint Cold Joint Details - Swimming Pool
Schematic No. 20
Construction Joint Cold Joint Details - Sewage Plant Clarifer Tank
Schematic No. 21
Construction Joint Cold Joint Details - Sewage Digester Tank with Kicker
Schematic No. 22
Construction Joint Cold Joint Details - Reservoir Wet Well with Constant Internal Hydrostatic Pressure
Schematic No. 23
Construction Joint Cold Joint Details - Underground Vault, Dry Well
Schematic No. 24a
Construction Joint Cold Joint Details - Precast, Formed Concrete Manhole
Schematic No. 24b
Construction Joint Cold Joint Details - Precast, Formed Wastewater Manhole
Schematic No. 25
Construction Joint Cold Joint Details - Bridges
Schematic No. 26a
Construction Joint Cold Joint Details -Precast, Formed Pump Station
Schematic No. 26b
Construction Joint Cold Joint Details -Precast/Formed Wastewater/Recycled/Aggressive Water Pump Station