Technical Series - Whole of Life Costing

The first of the 2020 Xypex Technical Series. Xypex Australia, Technical Engineer, Joshua Hall introduces a Case Study of Whole of Life Costing. Join us for the 6 part series to explore industry issues and unpack concrete topics.

Read the Case Study to better understand; not only the concept, but the cost savings that can be achieved by undertaking this sort of analysis of Concrete Assets.

Keep an eye out for the next topic, Concrete Repair Methods.

If you have any questions about Whole of Life Cycle Costing or general Concrete enquiries, please feel free to make contact with Josh at joshuah@xypex.com.au or at 0260402444

For Case Study Appendix, see here.

 

Media