Bogong Power Station - Construction

AGL Southern Hydro has constructed the Bogong Power Development, part of the Kiewa Hydro-Electric Scheme near Mt Beauty in Victoria.

Two turbines will be installed and will generate 140mw.

Xypex Admix C-1000 NF was specified in 12,000 cubic metres of concrete for the purpose of waterproofing and providing long term durability to the structure. Concrete was supplied by Cemex from a mobile batch plant, 32 MPA concrete was dosed at 1%. (In excess of 45,000 kg's of Xypex Admix was used).

Tie bolt holes were patched utilizing the Xypex repair system which included M P&P and Flupps 22ST to 5,000 tie bolts.